Enterprise AI Bootcamp Demo 1

Naive text extraction against structure-preserving extraction

The same page, the same PDF bytes, extracted twice just now. On the left, pypdfium2 emitting the text in content-stream order, which is what most ingestion pipelines do. On the right, pdfplumber word boxes with our own layout logic: ruled-line and column-gap table detection, heading detection, and a Markdown rendering that keeps the cell grid.

FIST 4-1A (Jul 2020) — Maintenance Scheduling for Mechanical Equipment [SUPERSEDED] — page 7 of 222 · born-digital · structured extraction took 788 ms

Naive: pypdfium2.get_text_range()

6217 characters, no structure at all

FIST Volume 4-1A
Maintenance Scheduling for Mechanical Equipment
(FIST 016) 07/27/2020
NEW RELEASE v
2.5.1 Packing ............................................................................................................................45
2.5.2 Mechanical Seals.............................................................................................................46
2.6 Bearings ..............................................................................................................................47
2.6.1 Fluid Film Bearings .......................................................................................................47
2.6.2 Antifriction Bearings.....................................................................................................47
2.7 Shaft Couplings .................................................................................................................47
2.8 Shaft Alignment.................................................................................................................48
2.8.1 Horizontal Pump Alignment........................................................................................48
2.8.2 Face and Rim Alignment Method ...............................................................................50
2.8.3 Reverse Indicator Method............................................................................................55
2.9 Vibration Monitoring and Analysis................................................................................59
2.9.1 Proximity Probe Systems..............................................................................................59
2.9.2 Accelerometer Systems.................................................................................................60
2.9.3 Signature Analysis..........................................................................................................60
2.10 Oil and Lubricants ............................................................................................................61
2.10.1 Oil Lubrication...............................................................................................................62
2.10.2 Grease Lubrication ........................................................................................................62
2.10.3 Hydraulic Oil ..................................................................................................................63
2.10.4 Testing and Filtering......................................................................................................63
2.11 Inspection Checklist..........................................................................................................64
2.11.1 Hydraulic Turbines and Large Pumps........................................................................66
2.11.2 Auxiliary Pumps.............................................................................................................69
Penstocks, Outlet Pipes, Piping, Gates, and Valves..................................................... 71
3.1 Penstocks, Outlet Pipes, Lines, and Piping...................................................................71
3.2 Gates and Valves...............................................................................................................71
3.2.1 General ............................................................................................................................71
3.2.2 Gates................................................................................................................................75
3.2.3 Valves...............................................................................................................................87
3.2.4 Valve and Gate Operators............................................................................................91
3.3 Guard Gate and Valve Closure Tests.............................................................................98
3.4 Turbine Pressure Relief Valves.......................................................................................99
3.5 Auxiliary Piping Systems..................................................................................................99
3.6 Inspection Checklist....................................................................................................... 100
3.6.1 Gates and Valves......................................................................................................... 100
3.6.2 Penstocks, Outlet Pipes............................................................................................. 102
3.6.3 Gates and Valves......................................................................................................... 103
3.6.4 Gate and Valve Operators and Hoists..................................................................... 105
3.6.5 Guard Gate and Valve Closure Tests...................................................................... 107
3.6.6 Turbine Pressure Relief Valves Operational Tests................................................ 107
3.6.7 Auxiliary Piping Systems............................................................................................ 107
Governors ...................................................................................................................... 109
Air Compressors ........................................................................................................... 110
5.1 General............................................................................................................................. 110
5.2 Reciprocating Air Compressors................................................................................... 110
5.3 Rotary Screw Air Compressors.................................................................................... 110
5.4 Accessories...................................................................................................................... 111
5.4.1 Inlet Filters................................................................................................................... 111

Structure-preserving: pdfplumber + layout logic

3 blocks, 1 table(s) recovered

|  |  |  |  | FIST Vo | lume 4-1A |
|---|---|---|---|---|---|
|  |  |  | Mainte | nance Scheduling for Mechanical | Equipment |
|  | 2.5.1 Packing | ................. | ....................... | ................................................................... | ................. 45 |
|  | 2.5.2 Mechani | cal Seals.. | ....................... | ................................................................... | ................. 46 |
| 2.6 | Bearings .. | ................. | ....................... | ................................................................... | ................. 47 |
|  | 2.6.1 Fluid Fil | m Bearin | gs ................... | ................................................................... | ................. 47 |
|  | 2.6.2 Antifrict | ion Beari | ngs ................. | ................................................................... | ................. 47 |
| 2.7 | Shaft Cou | plings ...... | ....................... | ................................................................... | ................. 47 |
| 2.8 | Shaft Alig | nment ...... | ....................... | ................................................................... | ................. 48 |
|  | 2.8.1 Horizon | tal Pump | Alignment .... | ................................................................... | ................. 48 |
|  | 2.8.2 Face and | Rim Ali | gnment Meth | od .............................................................. | ................. 50 |
|  | 2.8.3 Reverse | Indicator | Method ........ | ................................................................... | ................. 55 |
| 2.9 | Vibration | Monitori | ng and Analys | is ............................................................... | ................. 59 |
|  | 2.9.1 Proximit | y Probe S | ystems .......... | ................................................................... | ................. 59 |
|  | 2.9.2 Accelero | meter Sy | stems ............. | ................................................................... | ................. 60 |
|  | 2.9.3 Signatur | e Analysis | ...................... | ................................................................... | ................. 60 |
| 2.10 | Oil and Lu | bricants . | ....................... | ................................................................... | ................. 61 |
|  | 2.10.1 Oil Lubr | ication .... | ....................... | ................................................................... | ................. 62 |
|  | 2.10.2 Grease L | ubricatio | n .................... | ................................................................... | ................. 62 |
|  | 2.10.3 Hydrauli | c Oil ....... | ....................... | ................................................................... | ................. 63 |
|  | 2.10.4 Testing | and Filter | ing .................. | ................................................................... | ................. 63 |
| 2.11 | Inspection | Checklis | t...................... | ................................................................... | ................. 64 |
|  | 2.11.1 Hydrauli | c Turbin | es and Large | Pumps ....................................................... | ................. 66 |
|  | 2.11.2 Auxiliary | Pumps .. | ....................... | ................................................................... | ................. 69 |
| Pen | stocks, Outlet | Pipes, Pi | ping, Gates, | and Valves ....................................... | .............. 71 |
| 3.1 | Penstocks, | Outlet P | ipes, Lines, a | nd Piping .................................................. | ................. 71 |
| 3.2 | Gates and | Valves .... | ....................... | ................................................................... | ................. 71 |
|  | 3.2.1 General | ................. | ....................... | ................................................................... | ................. 71 |
|  | 3.2.2 Gates .... | ................. | ....................... | ................................................................... | ................. 75 |
|  | 3.2.3 Valves... | ................. | ....................... | ................................................................... | ................. 87 |
|  | 3.2.4 Valve an | d Gate O | perators ........ | ................................................................... | ................. 91 |
| 3.3 | Guard Ga | te and Va | lve Closure T | ests ............................................................ | ................. 98 |
| 3.4 | Turbine P | ressure R | elief Valves ... | ................................................................... | ................. 99 |
| 3.5 | Auxiliary P | iping Sys | tems .............. | ................................................................... | ................. 99 |
| 3.6 | Inspection | Checklis | t...................... | ................................................................... | .............. 100 |
|  | 3.6.1 Gates an | d Valves . | ....................... | ................................................................... | .............. 100 |
|  | 3.6.2 Penstoc | ks, Outlet | Pipes ............ | ................................................................... | .............. 102 |
|  | 3.6.3 Gates an | d Valves . | ....................... | ................................................................... | .............. 103 |
|  | 3.6.4 Gate an | d Valve O | perators and | Hoists ....................................................... | .............. 105 |
|  | 3.6.5 Guard G | ate and | Valve Closure | Tests ........................................................ | .............. 107 |
|  | 3.6.6 Turbine | Pressure | Relief Valves | Operational Tests .................................. | .............. 107 |
|  | 3.6.7 Auxiliary | Piping S | ystems ........... | ................................................................... | .............. 107 |
| Go | vernors ............ | ............... | .................... | ........................................................... | ............ 109 |
| Air | Compressors . | ............... | .................... | ........................................................... | ............ 110 |
| 5.1 | General .... | ................. | ....................... | ................................................................... | .............. 110 |
| 5.2 | Reciprocat | ing Air C | ompressors .. | ................................................................... | .............. 110 |
| 5.3 | Rotary Scr | ew Air C | ompressors ... | ................................................................... | .............. 110 |
| 5.4 | Accessorie | s .............. | ....................... | ................................................................... | .............. 111 |
|  | 5.4.1 Inlet Filt | ers ........... | ....................... | ................................................................... | .............. 111 |
| 16) | 07/27/2020 |  |  |  |  |
| ELE | ASE |  |  |  | v |

(FIST 016)

### NEW RELEASE
Read the left column as a retrieval unit The cell values are all present on the left. What is missing is which row and which column each one belongs to. An interval table extracted that way produces chunks that contain the right numbers attached to the wrong tasks, and no amount of prompt engineering downstream can put the grid back.

The recovered table

|  |  |  |  | FIST Vo | lume 4-1A |
|---|---|---|---|---|---|
|  |  |  | Mainte | nance Scheduling for Mechanical | Equipment |
|  | 2.5.1 Packing | ................. | ....................... | ................................................................... | ................. 45 |
|  | 2.5.2 Mechani | cal Seals.. | ....................... | ................................................................... | ................. 46 |
| 2.6 | Bearings .. | ................. | ....................... | ................................................................... | ................. 47 |
|  | 2.6.1 Fluid Fil | m Bearin | gs ................... | ................................................................... | ................. 47 |
|  | 2.6.2 Antifrict | ion Beari | ngs ................. | ................................................................... | ................. 47 |
| 2.7 | Shaft Cou | plings ...... | ....................... | ................................................................... | ................. 47 |
| 2.8 | Shaft Alig | nment ...... | ....................... | ................................................................... | ................. 48 |
|  | 2.8.1 Horizon | tal Pump | Alignment .... | ................................................................... | ................. 48 |
|  | 2.8.2 Face and | Rim Ali | gnment Meth | od .............................................................. | ................. 50 |
|  | 2.8.3 Reverse | Indicator | Method ........ | ................................................................... | ................. 55 |
| 2.9 | Vibration | Monitori | ng and Analys | is ............................................................... | ................. 59 |
|  | 2.9.1 Proximit | y Probe S | ystems .......... | ................................................................... | ................. 59 |
|  | 2.9.2 Accelero | meter Sy | stems ............. | ................................................................... | ................. 60 |
|  | 2.9.3 Signatur | e Analysis | ...................... | ................................................................... | ................. 60 |
| 2.10 | Oil and Lu | bricants . | ....................... | ................................................................... | ................. 61 |
|  | 2.10.1 Oil Lubr | ication .... | ....................... | ................................................................... | ................. 62 |
|  | 2.10.2 Grease L | ubricatio | n .................... | ................................................................... | ................. 62 |
|  | 2.10.3 Hydrauli | c Oil ....... | ....................... | ................................................................... | ................. 63 |
|  | 2.10.4 Testing | and Filter | ing .................. | ................................................................... | ................. 63 |
| 2.11 | Inspection | Checklis | t...................... | ................................................................... | ................. 64 |
|  | 2.11.1 Hydrauli | c Turbin | es and Large | Pumps ....................................................... | ................. 66 |
|  | 2.11.2 Auxiliary | Pumps .. | ....................... | ................................................................... | ................. 69 |
| Pen | stocks, Outlet | Pipes, Pi | ping, Gates, | and Valves ....................................... | .............. 71 |
| 3.1 | Penstocks, | Outlet P | ipes, Lines, a | nd Piping .................................................. | ................. 71 |
| 3.2 | Gates and | Valves .... | ....................... | ................................................................... | ................. 71 |
|  | 3.2.1 General | ................. | ....................... | ................................................................... | ................. 71 |
|  | 3.2.2 Gates .... | ................. | ....................... | ................................................................... | ................. 75 |
|  | 3.2.3 Valves... | ................. | ....................... | ................................................................... | ................. 87 |
|  | 3.2.4 Valve an | d Gate O | perators ........ | ................................................................... | ................. 91 |
| 3.3 | Guard Ga | te and Va | lve Closure T | ests ............................................................ | ................. 98 |
| 3.4 | Turbine P | ressure R | elief Valves ... | ................................................................... | ................. 99 |
| 3.5 | Auxiliary P | iping Sys | tems .............. | ................................................................... | ................. 99 |
| 3.6 | Inspection | Checklis | t...................... | ................................................................... | .............. 100 |
|  | 3.6.1 Gates an | d Valves . | ....................... | ................................................................... | .............. 100 |
|  | 3.6.2 Penstoc | ks, Outlet | Pipes ............ | ................................................................... | .............. 102 |
|  | 3.6.3 Gates an | d Valves . | ....................... | ................................................................... | .............. 103 |
|  | 3.6.4 Gate an | d Valve O | perators and | Hoists ....................................................... | .............. 105 |
|  | 3.6.5 Guard G | ate and | Valve Closure | Tests ........................................................ | .............. 107 |
|  | 3.6.6 Turbine | Pressure | Relief Valves | Operational Tests .................................. | .............. 107 |
|  | 3.6.7 Auxiliary | Piping S | ystems ........... | ................................................................... | .............. 107 |
| Go | vernors ............ | ............... | .................... | ........................................................... | ............ 109 |
| Air | Compressors . | ............... | .................... | ........................................................... | ............ 110 |
| 5.1 | General .... | ................. | ....................... | ................................................................... | .............. 110 |
| 5.2 | Reciprocat | ing Air C | ompressors .. | ................................................................... | .............. 110 |
| 5.3 | Rotary Scr | ew Air C | ompressors ... | ................................................................... | .............. 110 |
| 5.4 | Accessorie | s .............. | ....................... | ................................................................... | .............. 111 |
|  | 5.4.1 Inlet Filt | ers ........... | ....................... | ................................................................... | .............. 111 |
| 16) | 07/27/2020 |  |  |  |  |
| ELE | ASE |  |  |  | v |

51 rows × 6 columns

Data quality: the text layer we were given

This page's naive text scores 0.99 on a crude legibility measure (junk-character ratio 0.000, single-character orphan tokens 0.004). The Internet Archive microfiche scans carry a 1990s OCR layer, and it is wrong in ways that matter: the Stewart-Warner cover reads TM 59-4310 -275-14 for TM 5-4310-275-14, 4 CFM, 3000 PS! for PSI, and JUNE 1935 for June 1975. That is not a defect in this demonstration; it is what a scanned service archive is, and it is the reason exact model-string matching cannot be the only variant guard.

DocumentSourceOCR score PagesTablesObserved misreads
TM 9-4310-241-35P — Champion LP-512-ENG / LP-512-ENG-1 / OEH-34-60-ENGscanned-microfiche0.429116PSI misread ×3, pipe/bang inside a word ×2, l/I/1 confusion ×12
TM 5-4310-277-25P — Champion Pneumatic HGR5-8M-1 and BGR-5M-1, 15 CFM scanned-microfiche0.5210455PSI misread ×9, pipe/bang inside a word ×14, l/I/1 confusion ×24
TM 3-1040-244-35P — Compressor, Reciprocating, Power-Driven, Flamethroscanned-microfiche0.547735pipe/bang inside a word ×6, l/I/1 confusion ×12, letter-spaced fragmentation ×3
TM 5-4310-227-34P — Champion Pneumatic OEG-458-ENG-1/-2/-3 and BMW-452scanned-microfiche0.6011441PSI misread ×1, pipe/bang inside a word ×4, l/I/1 confusion ×11
TM 5-4310-277-14 — Champion Pneumatic HGR5-8M-1 (tank mounted) and BGRscanned-microfiche0.641394PSI misread ×9, pipe/bang inside a word ×3, l/I/1 confusion ×16
TM 3-4310-100-20&P — Compressor Unit, Reciprocating, Power-Driven, Flascanned-microfiche0.64516PSI misread ×1, TM number mangled ×6, pipe/bang inside a word ×1
TM 3-4310-100-20&P — alternate scan of the same manual (near-duplicatescanned-microfiche0.65570TM number mangled ×4, pipe/bang inside a word ×1, l/I/1 confusion ×10
TM 9-4310-241-15 — Compressor, Reciprocating, Air, 5 CFM 175 PSI (Chamscanned-microfiche0.651326PSI misread ×15, pipe/bang inside a word ×1, l/I/1 confusion ×26
TM 5-4310-378-14 — Compressor Unit, Reciprocating, 5 CFM 175 PSI, gasoscanned-microfiche0.661544PSI misread ×4, pipe/bang inside a word ×1, l/I/1 confusion ×15
TM 5-4310-221-15 — Ingersoll-Rand GER-125, rotary, skid mounted, gasolscanned-microfiche0.662128PSI misread ×9, l/I/1 confusion ×43, letter-spaced fragmentation ×4
TM 9-4310-227-15 — Compressor, Reciprocating, Air, gasoline engine driscanned-microfiche0.661707PSI misread ×4, pipe/bang inside a word ×3, l/I/1 confusion ×19
TM 5-4310-339-15 — Compressor, Reciprocating, Air, 15 CFM 175 PSI, elescanned-microfiche0.66551PSI misread ×4, l/I/1 confusion ×12
TM 5-4310-363-14 — Bauer KAB-545-15, 15 CFM 175 PSI, tank mounted, GEDscanned-microfiche0.671309PSI misread ×9, l/I/1 confusion ×19, letter-spaced fragmentation ×1
TM 5-4310-275-14 — Stewart-Warner 43040-301-01, reciprocating, GED, 2-scanned-microfiche0.671224PSI misread ×4, TM number mangled ×2, l/I/1 confusion ×21
TM 5-4310-360-14 — Compressor, Reciprocating, Air, hand-truck mounted,scanned-microfiche0.67928PSI misread ×1, TM number mangled ×1, l/I/1 confusion ×19
TM 5-4310-354-14 — Davey 6M125, rotary, skid mounted, diesel, 125 CFM scanned-microfiche0.6731614PSI misread ×25, pipe/bang inside a word ×2, l/I/1 confusion ×22
FIST 4-1A Rev 3.0 — Maintenance Scheduling for Mechanical Equipmentborn-digital0.6920055l/I/1 confusion ×45
FIST 4-1A (May 2024) — Maintenance Scheduling for Mechanical Equipmentborn-digital0.6920866l/I/1 confusion ×46
FIST 4-1A (Jul 2020) — Maintenance Scheduling for Mechanical Equipmentborn-digital0.6922252l/I/1 confusion ×46
FIST 1-1 — Hazardous Energy Control Program (lockout/tagout)born-digital0.69972l/I/1 confusion ×25
Improving Compressed Air System Performance — Compressed Air Challengeborn-digital0.721143l/I/1 confusion ×12, letter-spaced fragmentation ×1
Improving Compressed Air System Performance: A Sourcebook for Industryborn-digital0.721143l/I/1 confusion ×12, letter-spaced fragmentation ×1
FIST 2-9 — Inspection of Unfired Pressure Vesselsborn-digital0.75415l/I/1 confusion ×12
FIST 2-6 — Maintenance of Auxiliary Mechanical Equipmentborn-digital0.84861l/I/1 confusion ×8
FIST 2-4 — Lubrication of Equipmentborn-digital0.95486l/I/1 confusion ×1

Index built by scripts/build_index.py at 2026-08-10 01:44:34 in 711s: 25 documents, 3,146 pages, 12,590 improved chunks / 5,434 naive chunks. Embeddings: Snowflake/snowflake-arctic-embed-s (int8 ONNX, Apache-2.0). Reranker: cross-encoder/ms-marco-MiniLM-L-6-v2 (ONNX, Apache-2.0).